The stadium is designed to hold 6,500 students with expansion possibilities in the future.  The Wellness facility in approximately 24,000 square feet and will house the home and visitor’s locker rooms.  This facility includes a state of the art training facility and whirlpool for all athletes on campus.  The weight and cardio areas comprise over 5,500 square feet of the facility.    

The new high school for the Bridge Creek Public Schools will be the first brick facility in the district.  As a small growing school district the needs for a larger facility to house more students were a major influence.  The 54,000 square foot building has safe rooms that were designed on the FEMA guidelines and can handle over 500 students.  The facility provided a second cafeteria for the district as well as science rooms, library, computer

This project was a renovation / addition to the existing facility. The extensive renovation removed a majority of the walls including most of the existing slab. The project included adding an additional drive through bay as well as ADA accessibility updates and more support spaces, increasing the overall square footage to 9300 square feet.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Maecenas ultrices urna sed nunc rhoncus faucibus. Cras dui velit, mollis mattis nisl sed, semper interdum turpis. Proin malesuada pellentesque consequat. Morbi facilisis vulputate libero at tincidunt. Duis in tempor massa. Aliquam condimentum, diam eu mattis elementum, ipsum arcu sagittis enim, eget dictum ante felis at enim.

Project Summary: This 30,000 square foot office building was designed to house a restaurant and bank on the lower level.  The bank housed a small teller area for the drive through lanes that were incorporated into the building design.  The upper floor were designed to allow multiple tenant spaces that all access the large corridor and two story atrium space at the main entry.  The facility is located just north-east of the bom

This is a 17,200 square foot vehicle storage facility created for the Oklahoma City Fire Department. Located at SW 15th Street and Portland Avenue the structure houses 20 bays with drive-thru access.

Project Summary: This gymnasium seats over 3,000 people with the lobby space for several hundred additional people to watch.  There are 3 locker rooms for both women and men including additional locker rooms for football and wrestling.  There are practice areas 40’x40’ for both Cheer and Pom including their own locker room.  In addition there is a media room, training room, weight room and additional space for future growth. 

This 9,000 square foot classroom and gymnasium addition shares the materials and detailing of the original building to create a seamless transition between the new and previous additions. The interior finishes are based on the buildings current color schemes following a 2012 renovation.

This 8,700 square foot addition is a single building added to the existing classroom and media center wing for the school. A new accessible entry area with ramp is included to facilitate after school activities.

The 83,000 square foot middle school was designed for 500 students with the ability to expand to 900 in the future.  The kitchen was designed to accommodate the future growth without a major renovation.  The facility is equipped with four safe rooms, three science rooms, art room, computer lab, library, vocal music room, gymnasium, four locker rooms and several special needs spaces.  The new facility was designed so that after hours activities

This is an 6,500 sq.ft. facility that has a six lane drive through. This facility is designed to handle the south Oklahoma City area. Its modern design allows customers to access their account via the internet and check the latest rates on the computers located in the “Personal Finance Café”.

Subscribe to Portfolio

Contact Us

Our knowledgeable and friendly staff are happy to answer questions and get the process started.

Email Us   Give us a call